| 2/10/2026 |
(SB651)
AMENDMENT(S) PROPOSED BY THE SENATE
COMMERCE AND LABOR
1. Line 22, introduced, after least
strike
one megawatt
insert
25 megawatts
COMMERCE AND LABOR
2. Line 32, introduced, after underground.
insert
However, "underground electric distribution or transmission improvements" does not include relocating or converting any existing overhead electric distribution line underground if broadband cable is attached to the poles supporting such line.