OFFERED FOR CONSIDERATION1/21/2025


SB 973

AGRICULTURE, CONSERVATION AND NATURAL RESOURCES

1. Line 30, introduced, after require

strike

the remainder of line 30 and through from on line 31

AGRICULTURE, CONSERVATION AND NATURAL RESOURCES

2. Line 31, introduced, after methane

insert

to (i) certify

AGRICULTURE, CONSERVATION AND NATURAL RESOURCES

3. Line 33, introduced, after market

insert

and (ii) utilize a qualified independent third-party entity to verify the waste mine methane portion of gas delivered to an approved electric generation project

AGRICULTURE, CONSERVATION AND NATURAL RESOURCES

4. Line 36, introduced, after megawatts

insert

, provided that the total combined capacity of all Phase I Utility projects does not exceed 25 megawatts

AGRICULTURE, CONSERVATION AND NATURAL RESOURCES

5. Line 37, introduced, after 50 megawatts

insert

, provided that the total combined capacity of all Phase II Utility projects does not exceed 50 megawatts

AGRICULTURE, CONSERVATION AND NATURAL RESOURCES

6. Line 53, introduced, after Virginia.

insert

For purposes of meeting the renewable energy portfolio standard requirements established in ยง 56-585.5 of the Code of Virginia, only waste mine methane captured by sources issued their first American Petroleum Institute (API) number by the Department of Energy after the approval date of the associated non-combustion electric generation project shall quality as eligible waste mine methane.