2025 SESSION

INTRODUCED

25103603D

SENATE BILL NO. 1058

Offered January 8, 2025

Prefiled January 7, 2025

A BILL to amend and reenact §§ 56-594 and 56-594.01 of the Code of Virginia, relating to net energy metering; interconnection costs for public schools.

—————

Patron—Ebbin

—————

Referred to Committee on Commerce and Labor

—————

Be it enacted by the General Assembly of Virginia:

1. That §§ 56-594 and 56-594.01 of the Code of Virginia are amended and reenacted as follows:

§ 56-594. Net energy metering provisions.

A. The Commission shall establish by regulation a program that affords eligible customer-generators the opportunity to participate in net energy metering, and a program, to begin no later than July 1, 2014, for customers of investor-owned utilities and to begin no later than July 1, 2015, and to end July 1, 2019, for customers of electric cooperatives as provided in subsection G, to afford eligible agricultural customer-generators the opportunity to participate in net energy metering. The regulations may include, but need not be limited to, requirements for (i) retail sellers; (ii) owners or operators of distribution or transmission facilities; (iii) providers of default service; (iv) eligible customer-generators; (v) eligible agricultural customer-generators; or (vi) any combination of the foregoing, as the Commission determines will facilitate the provision of net energy metering, provided that the Commission determines that such requirements do not adversely affect the public interest. On and after July 1, 2017, small agricultural generators or eligible agricultural customer-generators may elect to interconnect pursuant to the provisions of this section or as small agricultural generators pursuant to § 56-594.2, but not both. Existing eligible agricultural customer-generators may elect to become small agricultural generators, but may not revert to being eligible agricultural customer-generators after such election. On and after July 1, 2019, interconnection of eligible agricultural customer-generators shall cease for electric cooperatives only, and such facilities shall interconnect solely as small agricultural generators. For electric cooperatives, eligible agricultural customer-generators whose renewable energy generating facilities were interconnected before July 1, 2019, may continue to participate in net energy metering pursuant to this section for a period not to exceed 25 years from the date of their renewable energy generating facility's original interconnection.

B. For the purpose of this section:

"Eligible agricultural customer-generator" means a customer that operates a renewable energy generating facility as part of an agricultural business, which generating facility (i) uses as its sole energy source solar power, wind power, or aerobic or anaerobic digester gas, (ii) does not have an aggregate generation capacity of more than 500 kilowatts, (iii) is located on land owned or controlled by the agricultural business, (iv) is connected to the customer's wiring on the customer's side of its interconnection with the distributor; (v) is interconnected and operated in parallel with an electric company's transmission and distribution facilities, and (vi) is used primarily to provide energy to metered accounts of the agricultural business. An eligible agricultural customer-generator may be served by multiple meters serving the eligible agricultural customer-generator that are located at the same or adjacent sites, such that the eligible agricultural customer-generator may aggregate in a single account the electricity consumption and generation measured by the meters, provided that the same utility serves all such meters. The aggregated load shall be served under the appropriate tariff.

"Eligible customer-generator" means a customer that owns and operates, or contracts with other persons to own, operate, or both, an electrical generating facility, including any additions or enhancements such as battery storage or a smart inverter, that (i) has a capacity of not more than 25 kilowatts for residential customers and not more than three megawatts for nonresidential customers; (ii) uses as its total source of fuel renewable energy, as defined in § 56-576; (iii) is located on land owned or leased by the customer and is connected to the customer's wiring on the customer's side of its interconnection with the distributor; (iv) is interconnected and operated in parallel with an electric company's transmission and distribution facilities; and (v) is intended primarily to offset all or part of the customer's own electricity requirements. No contract, lease, or arrangement by which a third party owns, maintains, or operates an electrical generating facility on an eligible customer-generator's property shall constitute the sale of electricity or cause the customer-generator or the third party to be considered an electric utility by virtue of participating in net energy metering. In addition to the electrical generating facility size limitations in clause (i), the capacity of any generating facility installed under this section between July 1, 2015, and July 1, 2020, shall not exceed the expected annual energy consumption based on the previous 12 months of billing history or an annualized calculation of billing history if 12 months of billing history is not available. In addition to the electrical generating facility size limitation in clause (i), in the certificated service territory of a Phase I Utility, the capacity of any generating facility installed under this section after July 1, 2020, shall not exceed 100 percent of the expected annual energy consumption based on the previous 12 months of billing history or an annualized calculation of billing history if 12 months of billing history is not available, and in the certificated service territory of a Phase II Utility, the capacity of any generating facility installed under this section after July 1, 2020, shall not exceed 150 percent of the expected annual energy consumption based on the previous 12 months of billing history or an annualized calculation of billing history if 12 months of billing history is not available.

"Net energy metering" means measuring the difference, over the net metering period, between (i) electricity supplied to an eligible customer-generator or eligible agricultural customer-generator from the electric grid and (ii) the electricity generated and fed back to the electric grid by the eligible customer-generator or eligible agricultural customer-generator.

"Net metering period" means the 12-month period following the date of final interconnection of the eligible customer-generator's or eligible agricultural customer-generator's system with an electric service provider, and each 12-month period thereafter.

"Small agricultural generator" has the same meaning that is ascribed to that term in § 56-594.2.

C. The Commission's regulations shall ensure that (i) the metering equipment installed for net metering shall be capable of measuring the flow of electricity in two directions and (ii) any eligible customer-generator seeking to participate in net energy metering shall notify its supplier and receive approval to interconnect prior to installation of an electrical generating facility. The electric distribution company shall have 30 days from the date of notification for residential facilities, and 60 days from the date of notification for nonresidential facilities, to determine whether the interconnection requirements have been met. Such regulations shall allocate fairly the cost of such equipment and any necessary interconnection, except that an eligible customer-generator that is a school in a public school division in the Commonwealth shall not bear the cost of any necessary interconnection. An eligible customer-generator's electrical generating system, and each electrical generating system of an eligible agricultural customer-generator, shall meet all applicable safety and performance standards established by the National Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories. Beyond the requirements set forth in this section and to ensure public safety, power quality, and reliability of the supplier's electric distribution system, an eligible agricultural customer-generator or eligible agricultural customer-generator other than a school in a public school division in the Commonwealth whose electrical generating system meets those standards and rules shall bear all reasonable costs of equipment required for the interconnection to the supplier's electric distribution system, including costs, if any, to (a) install additional controls and (b) perform or pay for additional tests. No eligible customer-generator or eligible agricultural customer-generator shall be required to provide proof of liability insurance or to purchase additional liability insurance as a condition of interconnection.

D. The Commission shall establish minimum requirements for contracts to be entered into by the parties to net metering arrangements. Such requirements shall protect the eligible customer-generator or eligible agricultural customer-generator against discrimination by virtue of its status as an eligible customer-generator or eligible agricultural customer-generator, and permit customers that are served on time-of-use tariffs that have electricity supply demand charges contained within the electricity supply portion of the time-of-use tariffs to participate as an eligible customer-generator or eligible agricultural customer-generator. Notwithstanding the cost allocation provisions of subsection C, eligible customer-generators or eligible agricultural customer-generators served on demand charge-based time-of-use tariffs shall bear the incremental metering costs required to net meter such customers.

E. If electricity generated by an eligible customer-generator or eligible agricultural customer-generator over the net metering period exceeds the electricity consumed by the eligible customer-generator or eligible agricultural customer-generator, the customer-generator or eligible agricultural customer-generator shall be compensated for the excess electricity if the entity contracting to receive such electric energy and the eligible customer-generator or eligible agricultural customer-generator enter into a power purchase agreement for such excess electricity. Upon the written request of the eligible customer-generator or eligible agricultural customer-generator, the supplier that serves the eligible customer-generator or eligible agricultural customer-generator shall enter into a power purchase agreement with the requesting eligible customer-generator or eligible agricultural customer-generator that is consistent with the minimum requirements for contracts established by the Commission pursuant to subsection D. The power purchase agreement shall obligate the supplier to purchase such excess electricity at the rate that is provided for such purchases in a net metering standard contract or tariff approved by the Commission, unless the parties agree to a higher rate. The eligible customer-generator or eligible agricultural customer-generator owns any renewable energy certificates associated with its electrical generating facility; however, at the time that the eligible customer-generator or eligible agricultural customer-generator enters into a power purchase agreement with its supplier, the eligible customer-generator or eligible agricultural customer-generator shall have a one-time option to sell the renewable energy certificates associated with such electrical generating facility to its supplier and be compensated at an amount that is established by the Commission to reflect the value of such renewable energy certificates. Nothing in this section shall prevent the eligible customer-generator or eligible agricultural customer-generator and the supplier from voluntarily entering into an agreement for the sale and purchase of excess electricity or renewable energy certificates at mutually-agreed upon prices if the eligible customer-generator or eligible agricultural customer-generator does not exercise its option to sell its renewable energy certificates to its supplier at Commission-approved prices at the time that the eligible customer-generator or eligible agricultural customer-generator enters into a power purchase agreement with its supplier. All costs incurred by the supplier to purchase excess electricity and renewable energy certificates from eligible customer-generators or eligible agricultural customer-generators shall be recoverable through its Renewable Energy Portfolio Standard (RPS) rate adjustment clause, if the supplier has a Commission-approved RPS plan. If not, then all costs shall be recoverable through the supplier's fuel adjustment clause. For purposes of this section, "all costs" shall be defined as the rates paid to the eligible customer-generator or eligible agricultural customer-generator for the purchase of excess electricity and renewable energy certificates and any administrative costs incurred to manage the eligible customer-generator's or eligible agricultural customer-generator's power purchase arrangements. The net metering standard contract or tariff shall be available to eligible customer-generators or eligible agricultural customer-generators on a first-come, first-served basis in each electric distribution company's Virginia service area until the rated generating capacity owned and operated by eligible customer-generators, eligible agricultural customer-generators, and small agricultural generators in the Commonwealth reaches six percent, in the aggregate, five percent of which is available to all customers and one percent of which is available only to low-income utility customers of each electric distribution company's adjusted Virginia peak-load forecast for the previous year, and shall require the supplier to pay the eligible customer-generator or eligible agricultural customer-generator for such excess electricity in a timely manner at a rate to be established by the Commission.

On and after the earlier of (i) 2024 for a Phase I Utility or 2025 for a Phase II Utility or (ii) when the aggregate rated generating capacity owned and operated by eligible customer-generators, eligible agricultural customer-generators, and small agricultural generators in the Commonwealth reaches three percent of a Phase I or Phase II Utility's adjusted Virginia peak-load forecast for the previous year, the Commission shall conduct a net energy metering proceeding.

In any net energy metering proceeding, the Commission shall, after notice and opportunity for hearing, evaluate and establish (a) an amount customers shall pay on their utility bills each month for the costs of using the utility's infrastructure; (b) an amount the utility shall pay to appropriately compensate the customer, as determined by the Commission, for the total benefits such facilities provide; (c) the direct and indirect economic impact of net metering to the Commonwealth; and (d) any other information the Commission deems relevant. The Commission shall establish an appropriate rate structure related thereto, which shall govern compensation related to all eligible customer-generators, eligible agricultural customer-generators, and small agricultural generators, except low-income utility customers, that interconnect after the effective date established in the Commission's final order. Nothing in the Commission's final order shall affect any eligible customer-generators, eligible agricultural customer-generators, and small agricultural generators who interconnect before the effective date of such final order. As part of the net energy metering proceeding, the Commission shall evaluate the six percent aggregate net metering cap and may, if appropriate, raise or remove such cap. The Commission shall enter its final order in such a proceeding no later than 12 months after it commences such proceeding, and such final order shall establish a date by which the new terms and conditions shall apply for interconnection and shall also provide that, if the terms and conditions of compensation in the final order differ from the terms and conditions available to customers before the proceeding, low-income utility customers may interconnect under whichever terms are most favorable to them.

F. Any residential eligible customer-generator or eligible agricultural customer-generator, in the service territory of a Phase II Utility who owns and operates, or contracts with other persons to own, operate, or both, an electrical generating facility with a capacity that exceeds 15 kilowatts shall pay to its supplier, in addition to any other charges authorized by law, a monthly standby charge. The amount of the standby charge and the terms and conditions under which it is assessed shall be in accordance with a methodology developed by the supplier and approved by the Commission. The Commission shall approve a supplier's proposed standby charge methodology if it finds that the standby charges collected from all such eligible customer-generators and eligible agricultural customer-generators allow the supplier to recover only the portion of the supplier's infrastructure costs that are properly associated with serving such eligible customer-generators or eligible agricultural customer-generators. Such an eligible customer-generator or eligible agricultural customer-generator shall not be liable for a standby charge until the date specified in an order of the Commission approving its supplier's methodology. For customers of all other investor-owned utilities, on and after July 1, 2020, standby charges are prohibited for any residential eligible customer-generator or agricultural customer-generator.

G. On and after the later of July 1, 2019, or the effective date of regulations that the Commission is required to adopt pursuant to § 56-594.01, (i) net energy metering in the service territory of each electric cooperative shall be conducted as provided in a program implemented pursuant to § 56-594.01 and (ii) the provisions of this section shall not apply to net energy metering in the service territory of an electric cooperative except as provided in § 56-594.01.

H. The Commission may adopt such rules or establish such guidelines as may be necessary for its general administration of this section.

I. When the Commission conducts a net energy metering proceeding, it shall:

1. Investigate and determine the costs and benefits of the current net energy metering program;

2. Establish an appropriate netting measurement interval for a successor tariff that is just and reasonable in light of the costs and benefits of the net metering program in aggregate, and applicable to new requests for net energy metering service;

3. Determine a specific avoided cost for customer-generators, the different type of customer-generator technologies where the Commission deems it appropriate, and establish the methodology for determining the compensation rate for any net excess generation determined according to the applicable net measurement interval for any new tariff; and

4. Make all reasonable efforts to ensure that the net energy metering program does not result in unreasonable cost-shifting to nonparticipating electric utility customers.

J. In evaluating the costs and benefits of the net energy metering program, the Commission shall consider:

1. The aggregate impact of customer-generators on the electric utility's long-run marginal costs of generation, distribution, and transmission;

2. The cost of service implications of customer-generators on other customers within the same class, including an evaluation of whether customer-generators provide an adequate rate of return to the electrical utility compared to the otherwise applicable rate class when, for analytical purposes only, examined as a separate class within a cost of service study;

3. The direct and indirect economic impact of the net energy metering program to the Commonwealth; and

4. Any other information it deems relevant, including environmental and resilience benefits of customer-generator facilities.

K. Notwithstanding the provisions of this section, § 56-585.1:8, or any other provision of law to the contrary, any locality that is a nonjurisdictional customer of a Phase II Utility, as defined in § 56-585.1:3, and is in Planning District Eight with a population greater than 1 million may (i) install solar-powered or wind-powered electric generation facilities with a rated capacity not exceeding five megawatts, whether the facilities are owned by the locality or owned and operated by a third party pursuant to a contract with the locality, on any locality-owned site within the locality and (ii) credit the electricity generated at any such facility as directed by the governing body of the locality to any one or more of the metered accounts of buildings or other facilities of the locality or the locality's public school division that are located within the locality, without regard to whether the buildings and facilities are located at the same site where the electric generation facility is located or at a site contiguous thereto. The amount of the credit for such electricity to the metered accounts of the locality or its public school division shall be identical, with respect to the rate structure, all retail rate components, and monthly charges, to the amount the locality or public school division would otherwise be charged for such amount of electricity under its contract with the public utility, without the assessment by the public utility of any distribution charges, service charges, or fees in connection with or arising out of such crediting.

L. Any eligible customer-generator or eligible agricultural customer-generator may participate in demand response, energy efficiency, or peak reduction from dispatch of onsite battery service, provided that the compensation received is in exchange for a distinct service that is not already compensated by net metering credits for electricity exported to the electric distribution system or compensated by any other utility program or tariff. The Commission shall review and evaluate the continuing need for the imposition of standby or other charges on eligible customer-generators or eligible agricultural customer-generators in any net energy metering proceeding conducted pursuant to subsection E.

§ 56-594.01. Net energy metering provisions for electric cooperative service territories.

A. The Commission shall establish by regulation a program that affords eligible customer-generators the opportunity to participate in net energy metering in the service territory of each electric cooperative, which program shall commence on the later of July 1, 2019, or the effective date of such regulations. Such regulations shall be similar to existing regulations promulgated pursuant to § 56-594. In lieu of adopting new regulations, the Commission may amend such existing regulations to apply to electric cooperatives with such revisions as are required to comply with the provisions of this section. The regulations may include requirements applicable to (i) retail sellers, (ii) owners or operators of distribution or transmission facilities, (iii) providers of default service, (iv) eligible customer-generators, or (v) any combination of the foregoing, as the Commission determines will facilitate the provision of net energy metering, provided that the Commission determines that such requirements do not adversely affect the public interest.

B. As used in this section:

"Eligible customer-generator" means a customer that owns and operates, or contracts with other persons to own, operate, or both, an electrical generating facility that (i) has a capacity of not more than 20 kilowatts for residential customers and not more than one megawatt for nonresidential customers on an electrical generating facility placed in service after July 1, 2015; (ii) uses as its total source of fuel renewable energy as defined in § 56-576; (iii) is located on the customer's premises and is connected to the customer's wiring on the customer's side of its interconnection with the distributor; (iv) is interconnected and operated in parallel with an electric company's transmission and distribution facilities; and (v) is intended primarily to offset all or part of the customer's own electricity requirements. In addition to the electrical generating facility size limitations in clause (i), the capacity of any generating facility installed under this section after July 1, 2015, shall not exceed the expected annual energy consumption based on the previous 12 months of billing history or an annualized calculation of billing history if 12 months of billing history is not available.

"Net energy metering" means measuring the difference, over the net metering period, between (i) electricity supplied to an eligible customer-generator from the electric grid and (ii) the electricity generated and fed back to the electric grid by the eligible customer-generator.

"Net metering period" means the 12-month period following the date of final interconnection of the eligible customer-generator's system with an electric service provider, and each 12-month period thereafter.

C. The Commission's regulations shall ensure that (i) the metering equipment installed for net metering shall be capable of measuring the flow of electricity in two directions and (ii) any eligible customer-generator seeking to participate in net energy metering shall notify its supplier and receive approval to interconnect prior to installation of an electrical generating facility. The Commission shall publish a form for such prior notice and such notice shall be processed promptly by the supplier prior to any construction activity taking place. After construction, inspection and documentation thereof shall be required prior to interconnection. The electric distribution company shall have 30 days from the date of each notification for residential facilities, and 60 days from the date of each notification for nonresidential facilities, to determine whether the interconnection requirements have been met. Such regulations shall allocate fairly the cost of such equipment and any necessary interconnection, except that an eligible customer-generator that is a school in a public school division in the Commonwealth shall not bear the cost of any necessary interconnection. An eligible customer-generator's electrical generating system shall meet all applicable safety and performance standards established by the National Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories. In addition to the requirements set forth in this section and to ensure public safety, power quality, and reliability of the supplier's electric distribution system, an eligible customer-generator other than a school in a public school division in the Commonwealth whose electrical generating system meets those standards and rules shall bear all reasonable costs of equipment required for the interconnection to the supplier's electric distribution system, including costs, if any, to (a) install additional controls, (b) perform or pay for additional tests, and (c) purchase additional liability insurance. An electric cooperative may publish and use its own forms, including an electronic form, for purposes of implementing the regulations described herein so long as the information collected on the Commission's form is also collected by the cooperative and submitted to the Commission.

D. The Commission shall establish minimum requirements for contracts to be entered into by the parties to net metering arrangements. Such requirements shall protect the eligible customer-generator against discrimination by virtue of its status as an eligible customer-generator and permit customers that are served on time-of-use tariffs that have electricity supply demand charges contained within the electricity supply portion of the time-of-use tariffs to participate as an eligible customer-generator. Notwithstanding the cost allocation provisions of subsection C, eligible customer-generators served on demand charge-based time-of-use tariffs shall bear the incremental metering costs required to net meter such customers.

E. If electricity generated by an eligible customer-generator over the net metering period exceeds the electricity consumed by the eligible customer-generator, the customer-generator shall be compensated for the excess electricity if the entity contracting to receive such electric energy and the eligible customer-generator enter into a power purchase agreement for such excess electricity. Upon the written request of the eligible customer-generator, the supplier that serves the eligible customer-generator shall enter into a power purchase agreement with the requesting eligible customer-generator that is consistent with the minimum requirements for contracts established by the Commission pursuant to subsection D. The power purchase agreement shall obligate the supplier to purchase such excess electricity at the rate that is provided for such purchases in a net metering standard contract or tariff approved by the Commission, unless the parties agree to a higher rate. The eligible customer-generator owns any renewable energy certificates associated with its electrical generating facility; however, at the time that the eligible customer-generator enters into a power purchase agreement with its supplier, the eligible customer-generator shall have a one-time option to sell the renewable energy certificates associated with such electrical generating facility to its supplier and be compensated at an amount that is established by the Commission to reflect the value of such renewable energy certificates. Nothing in this section shall prevent the eligible customer-generator and the supplier from voluntarily entering into an agreement for the sale and purchase of excess electricity or renewable energy certificates at mutually agreed upon prices if the eligible customer-generator does not exercise its option to sell its renewable energy certificates to its supplier at Commission-approved prices at the time that the eligible customer-generator enters into a power purchase agreement with its supplier. All costs incurred by the supplier to purchase excess electricity and renewable energy certificates from eligible customer-generators shall be recoverable through its fuel adjustment clause. For purposes of this section, "all costs" shall be defined as the rates paid to the eligible customer-generator for the purchase of excess electricity and renewable energy certificates and any administrative costs incurred to manage the eligible customer-generator's power purchase arrangements. The net metering standard contract or tariff shall be available to eligible customer-generators on a first-come, first-served basis, subject to the provisions of subsection F, and shall require the supplier to pay the eligible customer-generator for such excess electricity in a timely manner at a rate to be established by the Commission.

F. Net energy metering shall be open to customers on a first-come, first-served basis until such time as the total capacity of the generation facilities, expressed in alternating current nameplate, reaches two percent of system peak for residential customers, two percent of system peak for not-for-profit and nonjurisdictional customers, and one percent of system peak for other nonresidential customers, which are herein referred to as the electric cooperative's caps. As used in this subsection, "percent of system peak" refers to a percentage of the electric cooperative's highest total system peak, based on the noncoincident peak of the electric cooperative or the coincident peak of all of the electric cooperative's customers, within the past three years as listed in Part O, Line 20 of Form 7 filed with the Rural Utilities Service or its equivalent, less any portion of the cooperative's total load that is served by a competitive service provider or by a market-based rate. Such caps shall not decrease but may increase if the system peak in any year exceeds the previous year's system peak. Nothing in this subsection shall amend or confer new rights upon any existing nonjurisdictional contract or arrangement or work to submit any nonjurisdictional customer, contract, or arrangement to the jurisdiction of the Commission. For purposes of calculating the caps established in this subsection, all net energy metering shall be counted, whenever interconnected, and shall include net energy metering interconnected pursuant to § 56-594, agricultural net energy metering, and any net energy metering entered into with a third-party provider registered pursuant to subsection K. Net energy metering with nonjurisdictional customers entered into prior to July 1, 2019, may be counted toward the caps, in the discretion of the cooperative, as net energy metering if the nonjurisdictional customer takes service pursuant to a cooperative's net energy metering rider. Net energy metering with nonjurisdictional customers entered into on or after July 1, 2019, shall be counted toward the caps by default unless the cooperative has reason to exclude such net energy metering as subject to a separate contract or arrangement. Each electric cooperative governed by this section shall publish information regarding the calculation and status of its caps pursuant to this subsection, or the electric cooperative's systemwide cap established in § 56-585.4 if applicable, on the electric cooperative's website.

G. An electric cooperative may, without Commission approval or the requirement of any filing other than as provided in this subsection, upon the adoption by its board of directors of a resolution so providing, raise the caps established in subsection F, with any increase allocated among residential, not-for-profit and nonjurisdictional, and other nonresidential customers as the board of directors may find to be in the interests of the electric cooperative's membership. The electric cooperative shall promptly file a revised net energy metering compliance filing with the Commission for informational purposes.

H. Any residential eligible customer-generator who owns and operates, or contracts with other persons to own, operate, or both, an electrical generating facility with a capacity that exceeds 10 kilowatts shall pay to its supplier, in addition to any other charges authorized by law, a monthly standby charge. The amount of the standby charge and the terms and conditions under which it is assessed shall be in accordance with a methodology developed by the supplier and approved by the Commission. The Commission shall approve a supplier's proposed standby charge methodology if it finds that the standby charges collected from all such eligible customer-generators allow the supplier to recover only the portion of the supplier's infrastructure costs that are properly associated with serving such eligible customer-generators. Such an eligible customer-generator shall not be liable for a standby charge until the date specified in an order of the Commission approving its supplier's methodology.

I. Any eligible agricultural customer-generator interconnected in an electric cooperative service territory prior to July 1, 2019, shall continue to be governed by § 56-594 and the regulations adopted pursuant thereto throughout the grandfathering period described in subsection A of § 56-594.

J. Any eligible customer-generator served by a competitive service provider pursuant to the provisions of § 56-577 shall engage in net energy metering only with such supplier and pursuant only to tariffs filed by such supplier. Such an eligible customer-generator shall pay the full portion of its distribution charges, without offset or netting, to its electric cooperative.

K. After the conclusion of the Commission's rulemaking proceeding pursuant to subsection L, third-party partial requirements power purchase agreements, the purpose of which is to finance the purchase of renewable generation facilities by eligible customer-generators through the sale of electricity, shall be permitted pursuant to the provisions of this section only for those retail customers and nonjurisdictional customers of the electric cooperative that are exempt from federal income taxation, unless otherwise permitted by § 56-585.4 or subsection M. No person shall offer a third-party partial requirements power purchase agreement in the service territory of an electric cooperative without fulfilling the registration requirements set forth in this section and complying with applicable Commission rules, including those adopted pursuant to subdivision L 2.

L. After August 1, 2019, but before January 1, 2020, the Commission shall initiate a rulemaking proceeding to promulgate the regulations necessary to implement this section as follows:

1. In conducting such a proceeding, the Commission may require notice to be given to current eligible customer-generators and eligible agricultural customer-generators but shall not require general publication of the notice. An opportunity to request a hearing shall be afforded, but a hearing is not required. In the rulemaking proceeding, the electric cooperatives governed by this section shall be required to submit compliance filings, but no other individual proceedings shall be required or conducted.

2. In promulgating regulations to govern third-party power purchase agreement providers as retail sellers, the Commission shall:

a. Direct the staff to administer a registration system for such providers;

b. Enumerate in its regulations the jurisdiction of the Commission over providers, generally limited in scope to the behavior of providers, customer complaints, and their compliance with the registration requirements and stating clearly that civil contract disputes and claims for damages against providers shall not be subject to the jurisdiction of the Commission;

c. Enumerate in its regulations the maximum extent of its authority over the providers, to be limited to any or all of:

(1) Monetary penalties against registered providers not to exceed $30,000 per provider registration;

(2) Orders for providers to cease or desist from a certain practice, act, or omission;

(3) Debarment of registered providers;

(4) The issuance of orders to show cause; and

(5) Authority incident to subdivisions (1) through (4);

d. Delineate in its regulations two classes of providers, one for residential customers and one for nonresidential customers;

e. Direct the staff to set up a self-certification system as described in this subdivision;

f. Establish business practice and consumer protection standards from a national renewable energy association whose business is germane to the businesses of the providers;

g. Require providers to comply with other applicable Commission regulations governing interconnection and safety, including utility procedures governing the same;

h. Require minimum capitalization or other bond or surety that, in the judgment of the Commission, is necessary for adequate consumer protection and in the public interest;

i. Require the payment of a fee of $250 for residential and nonresidential provider registration; and

j. Provide that no registered provider, by virtue of that status alone, shall be considered a public utility or competitive service provider for purposes of this title.

3. The self-certification system described in this subdivision shall require a provider to affirm to the staff, under the penalty of revocation of registration, (i) that it is licensed to do business in Virginia; (ii) the names of the responsible officers of the provider entity; (iii) that its named officers have no felony convictions or convictions for crimes of moral turpitude; (iv) that it will abide by all applicable Commission regulations promulgated under this section or for purposes of interconnections and safety; (v) that it will appoint an officer to be a primary liaison to the staff; (vi) that it will appoint an employee to be a primary contact for customer complaints; (vii) that it will have and disclose to customers a dispute resolution procedure; (viii) that it has specified in its registration materials in which territories it intends to offer power purchase agreements; (ix) that it, and each of its named officers, agree to submit themselves to the jurisdiction of the Commission as described in this subdivision; and (x) that, once registered, the provider shall report any material changes in its registration materials to the staff, as a continuing obligation of registration. The staff shall send a copy of the registration materials to each cooperative in whose territory the provider intends to offer power purchase agreements. The staff, once satisfied that the certifications required pursuant to this subdivision are complete, and not more than 30 days following the initial and complete submittal of the registration materials, shall enter the provider onto the official register of providers. No formal Commission proceeding is required for registration but may be initiated if the staff (a) has reason to doubt the veracity of the certifications of the provider or (b) in any other case, if, in the judgment of the staff, extenuating or extraordinary circumstances exist that warrant a proceeding. The staff shall not investigate the corporate structure, financing, bookkeeping, accounting practices, contracting practices, prices, or terms and conditions in a third-party partial requirements power purchase agreement. Nothing in this section shall abridge the right of any person, including the Office of Attorney General, from proceeding in a cause of action under the Virginia Consumer Protection Act, § 59.1-196 et seq.

4. The Commission shall complete such rulemaking procedure within 12 months of its initiation.

M. An electric cooperative may, without approval of the Commission or the requirement of any filing other than as provided in this subsection, and upon the adoption by its board of directors of a resolution so providing, permit the use of any third-party partial requirements power purchase agreement, the purpose of which agreement is to finance the purchase of renewable generation facilities by eligible customer-generators through the sale of electricity for residential retail customers, nonresidential retail customers, or both. The electric cooperative shall promptly file a revised net energy metering compliance filing with the Commission for informational purposes.

2. That the State Corporation Commission shall promulgate regulations or amend existing regulations as necessary to implement the provisions of this act.